The project which leads to 100 % energy independence

IPI AG’s battery storage project aims to provide businesses with 100% energy independence. We began our work with the engineering of the pilot plant.

Project objective: The construction and operation of a 125 MW / 200 MWh battery power plant

Location: Relzow, Mecklenburg-Vorpommern

Function of the plant:

  •   Provision of primary control for security of supply and stability of thegrid
  •   Network and system integration of renewable energy
  •   Provide evidence of large-scale application of battery systems in the energy industry
  • Black- start capability

Expected Results of the Project:

  • Implementation of processes and system for market access to the energy control market
  •   Realized production capacity of MW units
  •   Implemented control station for battery-power plants and virtual power plant
  • Reach serial production for nationwide roll-out

Technology: NCM battery system, modular design (1MW / 2 MWh Units)

Cost: –